On March 24th, 2016, our engineers and clients went Bangladesh to finish installation to our clients. There are totally 10 sets 5~30 ton bridge cranes are used in waste transfer&processing station which is a government project, our Bangladesh client took a great power to carry on this project.0

On the first day, Ellsen Co., engineer and clients visited client’s company in Dhaka, we took Chinese tea to our kind partner as a company gift, and both sides went a happily talking about installation details.00

On the second day, they went to the station to finish the installation of I beam, crane rail and bus bar under the guidance of our engineer. Our professional engineer did it by himself when some points needed to be welded carefully. Then we taught to their workers how to weld and make the crane assembly.

Finally, all the bridge crane and crane parts have finished installation successfully within 10 days, our Bangladesh partner said they are looking forward to the second cooperation to us.22

Click Here to Send Inquiry or Email to Us

Your Name (required)

Your Email (required)

Your Message (required)